Product Description:
SUS304/SUS316L stainless steel ethanol distillation tower for pharmaceutical & fine chemical industry. Recycle waste ethanol solvent, reduce hazardous waste & production cost. Custom rectification system available
|
Items |
JH-200 |
JH-300 |
JH-400 |
JH-500 |
JH-600 |
JH-800 |
|
Tower Volume (L) |
640 |
1220 |
1450 |
2300 |
2500 |
3200 |
|
High Position Height (mm) |
6000 |
7000 |
7000 |
7000 |
7500 |
7500 |
|
High Tank Volume (L) |
300 |
400 |
650 |
800 |
1000 |
1500 |
|
Condensation Area (m²) |
5 |
9 |
11 |
18 |
25 |
45 |
|
Cooling Area (m²) |
1 |
1.5 |
2.2 |
4 |
6 |
8 |
|
Heat Exchange Area (m²) |
3.0 |
6.0 |
6.5 |
10 |
15 |
26 |
|
Recovery Capacity (kg/h) |
45-50 |
90-100 |
150-160 |
280-300 |
420-440 |
600-620 |
|
Recovery Concentration (%) |
>90 |
|||||
|
Padding Material Type |
ceramic or stainless steel corrugated padding material |
|||||
|
Dimension (L*W*H) mm |
2300*700*9300 |
2600*800*12500 |
2500*1000*15000 |
3000*1200*18000 |
3500*1400*18000 |
4200*1800*18000 |
Technology and Manufacturing
We are a Custom Alcohol Recovery Tower Manufacturers and Wholesale Alcohol Recovery Tower Suppliers .The company specializing in intelligent biological fermentation, intelligent plant (Chinese medicine, CBD) extraction, intelligent pharmaceutical engineering, natural food, energy saving and environmental protection and other fields of technology and intelligent engineering design, equipment manufacturing, supporting procurement, construction and installation, equipment Specialized biological and medical equipment innovation high tech enterprises with EPC/EPCM service engineering as the core of system integration and factory commissioning.
Technology and Manufacturing
Upstream process engineering Sixteen weeks into a microbial cell line development program, most teams are not waiting on molecular biology. They are waiting f......-Nov 25,2026
Most ICH Q7 findings at API plants are not paperwork failures. They are equipment and process failures: a vessel with an unverified cleaning limit, a drying s......-Nov 19,2026
Twenty-six hours in, the exhaust condenser goes quiet, the dissolved oxygen trace flattens, and the offline plate count comes back clean. The batch has not be......-Nov 14,2026
The schedule in biomanufacturing facility construction rarely breaks during steel erection. It breaks weeks earlier, when a vessel datasheet shows a 2.4 m imp......-Nov 06,2026